Construction of new wing in the 5th public school, Moschato

Building ConstructionPublic works

Client: Building Infrastructures plc

Budget: 1.250.000 €

Location: Moschato, Attica

Construction of a 1.300 m2 new wing in the 5th public school in Moschato, Attica.

  • Two storey building in contact with the pre existing school building.
  • “Berlin” type wall to avert landslides during excavation for the foundation.
  • 6 full size classrooms.
  • Restaurant, locker rooms, wc, storage spaces, boiler room, elevator engine room.
  • Green roof.
  • Construction of water supply, sewage, heating, electrical networks and elevator.
  • Classification in the KENAK A+ category for energy performance:
    • Thermal insulation of all the building external surfaces.
    • Heat insulated windows and doors with energy efficient glazing.
    • High performance natural gas heating system.
    • Independent heating control per room with temperature and presence sensors.
    • Independent lighting control per room with external lighting and presence sensors.
    • Power supply for school yard lighting from stand alone solar system.
  • Complete redesign and reconstruction of the school yard.


Back to category