Construction of public sewerage network, Yiannouli (phase 2)
Public worksSewerage
Client: ΔΕΥΑ Γιάννουλης - Φαλάνης
Budget: 2.400.000 €
Location: Γιάννουλη, Λάρισα
Construction of public sewerage network in Yiannouli, Larissa (phase 2).
Joint venture with 50% THALIS participation.
- Construction of public sewerage network of PVC pipes with a total length of 900 meters.
- Connection of 220 buildings to the public sewerage network.
Back to category