Construction of public sewerage network, Yiannouli (phase 1)

Public worksSewerage

Client: ΔΕΥΑ Γιάννουλης - Φαλάνης

Budget: 3.500.000 €

Location: Γιάννουλη, Λάρισα

Construction of public sewerage network in Yiannouli, Larissa (phase 1).

Joint venture with 30% THALIS participation.

  • Construction of public sewerage network of PVC pipes with a total length of 7.231 meters.
  • Construction of pumping station.

 



Back to category