Construction of public sewerage network, Yiannouli (phase 1)
Public worksSewerage
Client: ΔΕΥΑ Γιάννουλης - Φαλάνης
Budget: 3.500.000 €
Location: Γιάννουλη, Λάρισα
Construction of public sewerage network in Yiannouli, Larissa (phase 1).
Joint venture with 30% THALIS participation.
- Construction of public sewerage network of PVC pipes with a total length of 7.231 meters.
- Construction of pumping station.
Back to category